Live client portal · Updated July 14, 2026

Travis Wilcox

RISE Real Estate · Longball Capital

Your build is in motion. Campaign delivery has been stabilized around a safer hourly cadence, weekly reporting has been added to the operating plan, and the client project system now has a single overview, tracker, and workflow hub.

3Live systems
4In progress
3Queued
Jun 30–Jul 14Review window

Two-week build digest

A client-facing record of what shipped, what changed, and what remains active from June 30 through July 14. Status language is intentionally conservative: “Live” and “Verified” indicate observed operation; “In progress,” “Waiting,” and “Planned” do not.

Optimized

SMS sending cadence rebuilt

Daily capacity increased from 250 to 500 while delivery remained strong. After opt-outs rose to 13–14%, the workflow was changed from bulk batches to 45 messages per hour between 9:00 AM and 5:00 PM.

Scheduled

Weekly campaign reporting

A Friday campaign-performance report was requested, accepted by the delivery team, and set to include team@rspur.com. First-run delivery should be confirmed after the next scheduled report.

Live

Client project command center

Slack Project Overview, Project Tracker, and native Workflows tabs are organized as the operating source of truth, with 11 scoped work items.

Live

RISE / Longball operating stack

The active delivery stack is organized around GHL, the transaction-coordination portal, MLS offer generation, VoiceDrop, and the Hermes agent.

In progress

VoiceDrop + GHL integration

Contact upload, backend lead handoff, and client setup guidance remain active implementation work. This is not represented as fully live yet.

Planned

Gmail attachments → Drive → brain

A config-driven collector is designed, but client Google/Drive authorization and a controlled canary run are still required before deployment.

Next build lane